By Paula @ Holiday World
Published

And that's a good thing.

Pilgrims Plunge job site

They're still moving dirt on the job site. Packing it down, too.

The rain was welcome. It was like walking on the moon out there, after the dry summer.

Pilgrims Plunge construction site in 2008

In case you missed the tweet yesterday, Will says the massive footer at the base of Pilgrims Plunge's lift tower will include 200+ yards of concrete in one enormous block.

Leave a Comment

* indicates required field

  • (will not be published)